Project Highlights (Singapore)

OwnerEPCProjectType of FacilityScope of WorksContract PeriodPeak No of Personnel
Shell Seraya ChemicalJGCSIP 1 Pj. F-1301 Hot
Oil Heater Erection
Green field PetrochemicalSteel structure erection & Equipment installation.1996 Jan – Sep60
Shell Seraya ChemicalJGCSIP 1 ProjectGreen field PetrochemicalGround Assemble & Erection of Derek structure and flare tips. Flare Stack 90MH Wt. 150 Ton1996 Jan – Jun40
Exxon ChemicalKellog- Chiyoda JVSingapore Olefin Pj. – Jurong IslandGreen field PetrochemicalPiperack Module Installation, Pump
& Compressor installation. Heat Recovery Steam Generator (HRSG), Boiler, Equipment Structure Erection & Modification Works and Transportation roll off heavy equipment and heavy lifting. Tower internal installation.
Supervision & manpower
1999 Jan – 2001 Jan65
Exxon ChemicalKellog- Chiyoda JVSingapore Olefin Pj. – Jurong IslandGreen field PetrochemicalErection of Heat Recovery Steam Generator Stack - 2 units Ø5M x 75 Metres tall, Wt. 460 Ton
Equipment – 1,200 Ton Ringer Crane. Lump sum exclude crane
1999 Sep – Nov35
Exxon ChemicalKellog- Chiyoda JVSingapore Olefin Pj. – Jurong IslandGreen field PetrochemicalErection of Flare Stack 138 Metres, Wt 230 Ton (Tallest in Jurong Island) Equipment – 800 Ton Crawler Crane Lump sum exclude crane1999 Nov - 2000 Jun35
ExxonMobil PACChiyodaLXU Flue Gas Duct Rehabilitation PjBrown field RefineryFlue Gas Duct Rehabilitation LXU Shutdown Pj. (Main crane used : 400 Ton mobile crane)2000 May30
ExxonMobil PACChiyodaLVPS Turnaround PjBrown field RefineryFurnace Rehabilitation Project Remove and replace Flue Gas Duct and structure erection work. (Main equipment used : 360 Ton mobile crane)2000 Sep15
Shell Seraya ChemicalABB-JGC JVSIP 1 Revamp and SIP 2 New plant PJGreen & Brown fields PetrochemicalEquipment Installation and steel structure erection - Multi Mechanical works & tray internals, Structure Wt: 600 Ton, Est Equipment Wt: 220 Ton.2000 Jul – 2001 Dec60
Shell Seraya ChemicalABB-JGC JVSIP 2 PJ. New Plant PJGreen field PetrochemicalEquipment Installation and heavy lift. All vessels, pump, compressor installation. Heat Recovery Steam Generator (HRSG), Boiler, Transportation - roll off heavy equipment, Tower internal installation.2000 Aug – 2001
Dec
60
Shell Seraya ChemicalABB-JGC JVSIP 2 PJ. New Plant PJGreen field PetrochemicalErection of Flare Stack 105 Metres, Wt 255 Ton.
Main Equipment use – 800T crawler & 150T mobile.
2000 Dec – May 200135
Hitachi Cable (S)Hitachi Cable (S)Expansion & relocation PjBrown field ManufacturingRelocation and installation of Superfine Enamelling, Ovens and Bunching m/cs. STP Platform structure design, fabrication and installation ( Total Wt : 150Ton )2000 Jun – 2001
Feb
23
Teijin PolycarbonateNippon Express,TPS3, 2001
Turnaround Pj
Brown field PetrochemicalTeijin Polycarbonate PJ – TPS-3 Shutdown and TPS 4 new PJ Sakra – Equipment Installation & Equipment Structure Erection Works.2001 July – 2002 July50
UMCI Wafer FabUMCNew UMCI Wafer Fab Plant Pasir RisGreen field ManufacturingProcess Piperack Fabrication and Erection.
Est erection wt: 250 tons
2002 Mar – 2002 Oct45
Singapore Refining CompanyHiap Seng Engrg LtdRCC 2002 Turnaround PjBrown field PetrochemicalDismantle/Re-instate Cat Cooler Vertical Tube Bundle (56 ton), Plug Valve and Contactor Tube Bundle Cleaning and Relieve valves services.2002 Sep – 2002 Dec35
Schering PloughFoster WMulti Product Plant Project.Green field PharmaCompletion equipment installation Package 2 (Total 330 items)
2. R&D Building – equipment installation (105 items)
2001 Oct – 2003 Mar35
Merck Sharp & Dhome (S) Pte LtdFoster WSingapore Pharmaceutical Facility ProjectGreen field PharmaEquipment installation _ Mechanical Works Package 155 items and Pharmadule Module heavy lift installation.2002 Mar – 2002 Nov23
Glaxo Smith Kline Quality Rd FacilityFoster WSingapore Amoxyxilin plant upgrading projectBrown field PharmaEquipment installation and platform erection: 51 items. (50 Ton),
Platforms: 7 tons
2003 Apr – 2003 Aug25
Schering PloughFoster WMulti Product R&D Plant Project.Green field Pharma1. Equipment installation (61 items
– 42 ton, completion work 81 ton)
2. R&D Building – expansion (8 items)
3. Warehouse extension (18 items
– 18 Ton)
2003 Aug – 2004 Aug15
DupontHiap Seng Engrg Ltd,Deconstruction of Engineering Polymer Compound FacilityBrown field PetrochemicalRemoval of 201 items include Assist in packing and container stuffing - Drier, silos, reactors & heat exchanger2003 Feb – 2003 Apr15
PCSJGCPCS Olefin 1 Plant Turnaround PjBrown field PetrochemicalReplacement of 8 new and Rehabilitate 12 existing Titanum Heat Exchanger Est Wt. 233 ton 4 Drum Cleaning work2003 Aug - Sep48
Schering PloughFoster WMulti Product R&D Plant Project.Green field PharmaSchering Plough
R&D Expansion Project - Steriod plant
67 Items (Est Wt. 70 tons)
2003 Nov – 2004 May8
ExxonMobil PioneerHiap Seng Engrg Ltd,Turnaround PjBrown field RefineryReplacement o f Waste Heat Boiler at Pioneer Road facility.
Est Wt.: 61 ton
2004 Apr – 2004 May19
Sumitomo Chemical SMAGNippon ExpressSCO & SAA plant Annual Turnaround PjBrown field PetrochemicalMechanical maintenance work works for various equipment :Air Supply System, WP (Purified Water Facility), Flare, WC (Cooling
Tower) & BT (Bio-Treatment) & Steam (Valve) and removal & reinstatement of 148 Nos of safety
& control valves.
2004 Jun - July45
Shell Eastern PetroleumHiap Seng Engrg Ltd2004 Turnaround PjBrown field RefineryFurnace minor repair work – V- studs welding and support repair work.
12 Columns (man-way opening, cleaning and minor tray work & 25 Vessels (internal cleaning and minor change out works)
2004 May75
Akzo Nobel – PCS FacilityAudex Pte LtdPSP Plant facility expansionBrown field Petrochemical2 Equipment modules & 1 Staircase module
4.3M x 4.3M x 15MH
Est Str Wt: 31 ton Total Wt: 88 ton
2004 Aug - Sep20
Singapore Refining CompanyHiap Seng Engrg LtdReplacement of Air PreHeaterBrown field RefinerySingapore Refining Company - Replacement of Air Pre-Heater Work for Air Emission Project. Est Wt: 224.9 ton2004 Jul37
Merck Sharp & Dhome (S) Pte LtdFoster WSimvaStatin ProjectGreen field PharmaInstallation of Pharma Equipment. Total: 99 ites2004 Sep – 2005 Feb25
PUB SingaporeVortasChangi Water Reclamation ProjectGreen field WaterInstallation of 6 Butterfly valves, 1 Flowmeter and 1 Gate Valves. Ex Const Eqpt.
Total Wt. 94 ton.
2005 Mar10
PCSFoster WPCS Selectivity Improvement Project ShutdownBrown field PetrochemicalInstallation of Absorber, Vessel and Exchanger improvement.
Packing discharge and reload for Absorber Towers Dia 3M x 30MH (129M3 of packing over 4 chambers. Exchanger & Vessel cleaning work.
2005 Jun35
ExxonMobil ChemicalFoster WSCP 2005 Turnaround PjBrown field PetrochemicalTower & Drum cleaning & rehabilitation project.
6 Towers – largest Dia 13Mx9Mx30H EKT10 (Pyrolysis Fractionator)
Apr – Jun 200545
NH TechnoGlass
(S) Pte Ltd
Nippon ExpressNew G3 ProjectGreen field ManufacturingEquipment installation of a 4-storey ultra-thin glass panel
manufacturing plant.
2005 Mar - Jun25
VOPAK Banyan Terminal (S)Audex Pte Ltd, ChiyodaVopak Banyan Tank Farm constructionGreen field Oil TerminalRigging work to repair 4 Nos Wind- damaged tanks
Dia 14M through 18M – ex. eqpt.
2005 July8
VOPAK Banyan Terminal (S)ChiyodaVOPAK Banyan Tank Farm constructionGreen field Oil Terminal (workshop)Fabrication services - tank top walkway and Spiral stairway structural steel fabrication for 11 Nos of tanks. Est wt.: 100 ton.
Exclude material
2005 Jun – Sep20
Horizon Banyan Terminal (S)Pund LoydHorizon (S) Banyan Tank Farm constructionGreen field Oil Terminal (workshop)Fabrication services - Tank top walkway and Spiral stairway structural steel fabrication for 10 Nos of tanks. Est wt.: 150 Metric ton2005 Sep – Dec30
Norvatis Pharmaceutical (S)Foster WMulti-Product PlantGreen field PharmaInstallation of Pharma manufacturing equipment, 541 items – (621 ton), Pipe support steel structure fabricate & erection (260 ton)2005 Oct – 2006 Oct60
ExxonMobil ChemicalFoster W9th Furnace Pj Jurong IslandBrown field PetrochemicalErection of structure and equipment installation of 1,677 ton Floor, Radiant Panel, Radiant Coil, Convection Module Ducts, Stack, Ladder & Platform, Steam Drums, Burners, Silencer, Pipe Rack and Control Valve deck structure.2006 Jan– Sept65
Glaxo Smith Kline Pioneer RdFoster WR&D Chem-Dev Pilot PlantBrown field PetrochemicalEquipment installation: 37 items. (25 Ton), Platform erection: (22 tons)2006 Apr – Oct20
PCSHiap Seng LtdPCS PII D3 2006
Turnaround Project – Jurong Island
Brown field PetrochemicalMechanical services works. Total: 102 items consisting of towers internal tray replacement,
drum and condenser cleaning, heat exchanger/pumps replacement.
2006 May – Aug75
Singapore Refining CompanyJGCRCC Revamp 2006 PjBrown field PetrochemicalStructure fabrication & erection: (150 ton), Tower internal tray modification work, Air Fin Cooler, Heat Exchanger (27 items) and Pump (13 items) replacement.2006 May - Oct45
HuntsmanJacobsHuntsman SS JUR-R PlantGreen field PetrochemicalEquipment Installation works No of Eqpt: 108 items
Est Wt: 310 ton
2006 Oct – 2007 June30
Shell BukomFoster WRevamp & Modification Project (SBRM) – Pulau BukomBrown field RefineryFabrication and erection of Pipe rack revamp and addition project Est Wt: 700 ton2007 Jun – 2010 Feb70
Glaxo Smith KlineFoster W(GSK) SN02 Bulk
Vaccine Facility – Tuas South
Green field PharmaEquipment Installation works No of Eqpt: 700 items
Est Wt: 1,200 ton
Supply, Fabricate and erect Pipe Support and Platform structure. Est Wt: 255 ton
2007 Aug– 2008 Dec110
Rohmax Plant SingaporeJacobsRohmax Plant ProjectGreen field PetrochemicalEquipment Installation works No of Eqpt: 115 items
Est Wt: 465 ton
2007 Sept – 2008 Apr35
Tesa TapeTesa TapePipe Bridge relocation projectBrown field ManufacturingEquipment installation, small structure, piping & civil works2007– Oct - Nov15
Western Aust PetroleumHiap Seng LtdNingaloo Vision FPSO ProjectGreen field Marine (workshop)Fabrication of Booster Gas Compression Skid work
No of Skids: 4 Est Wt: 40 tons
2007 Nov – 2008 May12
Shell UlarFoster WHoudini Project ECCGreen field RefineryFabrication of tower platform & ladder. Est Wt: 70 Ton
Hhandrail installation works Substation: 9 Nos
Est Wt: 18 Ton
2007 Dec – 2008 Apr
2008 Jun - Aug
15
12
ExxonMobil PACFoster WPAC Visbreaker Air Preheater Rehabilitation PjBrown field RefineryErection of new APH (3 modules of total weight 49.8ton), erection of cold/hot air duct & flue gas duct (75.7ton), install expansion joints (4 sets), platform structure & strengthening works (~ 4.8ton)2008 Jun – Aug30
Chevron OroniteFoster WDetergent Expansion Project – Jurong IslandBrown field PetrochemicalSupply, Fabricate and Erect Pipe Rack & Equipment structure revamp & addition works
Est Wt : 650 tons
2008 Jun – 2009 July65
ExxonMobil ChemicalFoster W2009 Turnaround ProjectBrown field PetrochemicalBlock 2 & 3 equipment No of Eqpt:
65. Tower and drum cleaning Tray replacement
Remove and install new Vertical Drum (65ton)
2009 Jan – Jun110
Denka Jurong IslandNippon ExpressDenka – 2008 Turnaround ProjectBrown field PetrochemicalEquipment maintenance & small Piping work Manpower only.2008 Jul25
Rohm & HassFoster WRohm & Hass - 2008 Turnaround ProjectBrown field Petrochemical– 2008 shutdown Equipment maintenance,
Structural modification & small Piping work.
2008 Jul - Aug30
CIBA VisionJacobsCIBA Vision Jurong Island expansion PjGreen field PetrochemicalEuipment installation
Total nos of equipments 123, Total estimated weight 79.8 tons
2008 Aug - Oct16
Teijin PolycarbonateNippon ExpressTPS -2008 2008
Turnaround Project
Brown field PetrochemicalEquipment maintenance work – Mechanical seals change out, pumps & valves removal & reinstatement. Manpower only.2008 Nov45
Shell Eastern PetroleumFoster WJetty Interconnecting pipe line Project (Bukom & Seraya)Brown field RefineryPipe Rack and Equipment Installation (steel structure 140 tons, equipment 48 tons)2009 Feb – Mid-June30
Shell Eastern PetroleumFoster WShell ECC ProjectGreen field RefinerySupply, fabricate and Install Pipe Rack and pipe support installation (74 ton)Dec 2008 - Feb 200932
Neste OilTechnipNexte NexBtl ProjectGreen field BioDieselEquipment Installation 4612 ton Steel Structure Erection : 5200 ton Include construction equipment.Mar 2009 - Sep 2010350
Sumitomo Chemical SMAGNippon Express2009 SCO Plant Turnaround PjBrown field PetrochemicalTo remove for service and re- instatement of fan, motor and gear box of cooling tower.2009 July - Aug15
ExxonMobil ChemicalAPC, Shaw EnergyExxonMobil, SPT ProjectGreen field PetrochemicalProvide Supervision and manpower to assist in HRSG, Boiler & Turbine installation works.2009 July - Dec 201035
ExxonMobil PesekHiap Seng LtdExxonMobil STP ProjectBrown field RefineryHeavy Lifting services of Storage Tank Aluminum Dome Roof wt. 33 Ton, diameter: 51m,2009 July - Sep35
Shell Bukom RefineryFoster W2009 Turnaround Shell Bukom RefineryBrown field RefineryFabricate and replace air fin cooler casing structure (est wt. 19 ton) and Air fin cooler 2 set (est total wt 10t), remove & reinstate the four heat exchanger bundle (est wt. 16 ton).2009 Sep - Oct35
Shell Bukom RefineryFoster W2009 Turnaround Shell Bukom RefineryBrown field RefineryShell Bukom 2009 TA – Cracking Furnace
Ducting replacement (Est. 220ton) Furnace modification Replacement AHP (Est. 90ton)
2009 Sep - Oct47
ExxonMobilFoster WAir Preheater replacement PjBrown field RefineryInstallation of new CHD#3 APH on existing foundation (Est. 86.5 ton)Oct 2009 - Feb 201030
Denka Jurong IslandNippon ExpressDenka 2010 Turnaround PjBrown field RefineryProvide manpower for Mechanical work.Jan 2010 - Feb 201012
Shell Bukom RefineryChiyodaShell Bukom LRCCU RevampBrown field RefinerySupply, fabricate, modify and erect Steel Structure work Est. 140ton, Ducting replacement Est. 220 ton Equipment installation Est. 100 tonPre-TA 2010 Feb – Jun TA Aug 2010130
ExxonMobil PACFoster WExxonMobil PAC 2010 TABrown field RefineryExxonMobil D-5900 Drum removal Equipment : – Est. 75ton.
Structural:- Est. 3 ton
Tower & Drum – Hot work & piping works– 18 items
Tray replacement – 1 column / 51 trays
Drum replacement – 1 no/10ton
2010 Apr - Jun85
Oil TankingOil TankingReplace Foamlines, Riser and Sprikler lineBrown field TerminalReplace Foamlines, Riser and Sprikler line for Tank T-1212, T- 1213, T-1223. (Est. 1800 Dia-inch)2010 May – July12
Tesa TapeTesa TapeGlue Mixer Line Installation PjBrown field ManufacturingGlue Mixer Line Installation Steel Structural work – 11ton Equipment installation – 10ton Piping work – 1800 dia-inch Civil work – construct new wall (25m2), civil plinth2010 May - Sept12
Jurong CementZin MarineChain Bucket elevator rehabilitation PjBrown field PortReplace chain and re-instate existing bucket and associated accessories for the Chain Bucket Elevator: 2 Units Equipment and structure – Est. 30tonDec 2009 & May 201020
WilmarWilmarLPG FacilityGreen field BioDieselDesign review and vendor bid evaluation assistance.2011 Mar to Sept3
Sumitomo Chemical SMAGNippon Express2010 SCO Plant Turnaround PjBrown field PetrochemicalTo remove for service and re- instatement of fan, motor and gear box of cooling tower & flare items.2010 Jul - Aug15
Oil TankingOil TankingQ-Chem II Revamp ProjectBrown field TerminalEPC – Construction of new Truck Loading Bay, 6” pipeline diversion (600m) and upgrade existing heating system. In-line heat trace and tank heating system.
Participate in HAZOP review.
Oct 2010 ~ Apr 201135
ExxonMobil PioneerJacobs2010 ExxonMobil Turnaround PjBrown field RefineryExxonMobil 3RB 401 Air Preheater (APH) Cold Module replacement. Mobil Jurong 2011 TAPre-TA Oct 2010 – Feb 2011 TA Mar 201130
Shell UlarChiyodaShell Scot & Bugis Project – HDS5Green & Brown field RefinerySupply, fabricate, and erect Est 100 ton. Modify and erect Steel Structure Est. 1,000 ton,Sep 2011 – Jan 201360
ExxonMobil PACFoster WS’pore Hydro- Desulfurization HDF Project - OSBLBrown field RefinerySteel Structure detailing, modification and erection. Est: 190 Equipment Installation – Est 230 ton.Mar 2012 – Mar 201345
Shell Seraya ChemicalChiyodaGrease ProjectBrown field RefinerySupply, fabricate, modify and erect equipment structure. Est. 98 ton.
Install, replace and demolish static and rotating equipment. Est. 250 ton in 2x pre-turnaround & turnaround period.
Aug 2013 – Feb 201460
TOLL Logistic Asia Pte LtdD' Perception (S) Pte Ltd19 Jalan Buroh - TOLL's WarehouseWarehouseSupply, fabricate & installation of steel Structure Office (16mX11.7mX3.5m)Incl' roofing & side wall claddingEnd Sept 2014 to Dec 201515
TOLL Logistic Asia Pte LtdD' Perception (S) Pte Ltd19 Jalan Buroh - TOLL's WarehouseWarehouseSupply, fabricate & installation of steel Structure Office (28mX8.6mX3.5m) including roofing & side wall claddingEnd Sept 2014 to Dec 201515
Afton ChemicalAmec Foster WheelerLION ProjectGreen FieldColumn Internal Tray Installation and Conveyor Assembly and InstallationNovember to December 201525
LTA - Downtown Line (T215)Tat Hong Plant LeasingThomson Line - Old Police Academy (T215 Line)Tunnel - Assembly and Disassembly of TBMSupply of Manpower for Assembly and Disassembly of Tunnel Boring MachineDec 2015 to Present30
Shell Seraya ChemicalChiyoda/Rotary IMCSSF and BS ProjectBrown field RefineryEquipment Installation works No of Eqpt: 5 items
Est Wt: 100 ton
End June to August 201615
Sengkang Community HospitalPOC / ITS Science and MedicalSengkang Community Hospital ProjectHospital Installation of Modular Operating Theatre (MOT)August to Present45

Project Highlights (West Malaysia)

OwnerEPCProjectType of FacilityScope of WorksContract PeriodPeak No of Personnel
MHI KUANTAN,
Malaysia
MTBE ProjectGreen Field RefineryAssist in installation of Towers, Drums, Heat Exchangers, Platform, Pumps Compressors, AFC. Reactors
& Boiler (Heaviest Tower wt; 400 Ton x 60 MH)
199280
PETRONASChiyodaPSR-2 Melaka Refinery Stage 1 Pj.Green Field RefineryAssist in nstallation 8 nos. of Fired Heaters, 1 no. of Flare Stack
Conveyors & Equipments. ( Total Wt. 15,000 Ton )
1996 -
1998
200
HITACHI CABLE
(M) SDN BHD
HITACHI CABLEFactory revamp & relocation PjBrown field ManufacturingRelocation and installation of reconditioned Cable Manufacturing m/cs. Steel frame partition design, fabrication and installation for RBD m/c area. ( Est Wt :100t)2000 Aug &
2001 Jan
25
HITACHI CABLE
(M) SDN BHD
HITACHI CABLEFactory revamp & relocation PjBrown fieldRelocation and installation of Cable Wire Manufacturing m/cs. 70 items ( Est Wt : 256t
)
2004 Feb30
HITACHI CABLE
(M) SDN BHD
HITACHI CABLEFactory revamp PjManufacturingInstallation of Cable Wire Manufacturing m/cs, modify existing, fabricate and erect new platform (10 items Wt: 23 Ton & 5 platforms Wt : 13 Ton2005 Jan25
TITAN PETROCHEMICAL JOHORJGCFurnace installation ProjectBrown field PetrochemicalFurnace installation - Equipment and Structure & pipe rack + CV deck for valves. Est 600 ton2006 Jun
2007 May
75
HITACHI CABLE
(M) SDN BHD
HITACHI CABLEOngoing maintenanceBrown field ManufacturingIn house mechanical maintenance works.Annually10
AKASHI KIKAI
Malaysia
NIPPON EXPRESSAKASHI KIKAI
UB 1250ton H DIE CASTING MACHINE
Green FieldInstallation of Die casting machine and robotic arm 1st LineDec, 201215
VAOPAK-DIALOG
Malaysia
TOA CORPORATIONIndependent Deepwater Pengerang TerminalGreen FieldSupply, fabricate and install 750ton of jetty pipe rack steel structure (Outer Arm) & various auxiliary structures.Feb 2012 –
Dec 2013
75
AKASHI KIKAI
Malaysia
NIPPON EXPRESSAKASHI KIKAI
UB 1250ton H DIE CASTING MACHINE
Green FieldInstallation of Die casting machine and robotic arm 2nd LineDec, 201315